Cairo Metro Fiber Backbone Network
120 km metro fiber backbone connecting major Cairo exchange points.
Challenge
Dense urban environment with complex permitting, existing utility conflicts, and strict uptime requirements during cutover.
Solution
Micro-trenching and directional drilling techniques minimized surface disruption. Staged cutover plan maintained service continuity.
Result
Backbone delivered 6 weeks ahead of schedule with documented OTDR test results for every fiber span.